## [ESS schedule start during grid loss event shuts down all multiplus hard](https://community.victronenergy.com/t/ess-schedule-start-during-grid-loss-event-shuts-down-all-multiplus-hard/64467)

<div class="topic-metadata">

**Author:** [@Trant](https://community.victronenergy.com/u/Trant)\
**Replies:** 6\
**Last updated:** [28 October 2026 11:24 UTC](https://community.victronenergy.com/t/ess-schedule-start-during-grid-loss-event-shuts-down-all-multiplus-hard/64467 "2026-10-28T11:24:32Z")

</div>

Hi, Today my system is in a grid loss event thus the victron system goes in emergency mode. All loads are properly serviced from the battery and pv is stored in the battery. So far so good. However, I also have a sche…

---

## [Multi RS Solar ESS feeds PV to grid instead of charging](https://community.victronenergy.com/t/multi-rs-solar-ess-feeds-pv-to-grid-instead-of-charging/64330)

<div class="topic-metadata">

**Author:** [@hennephuis](https://community.victronenergy.com/u/hennephuis)\
**Replies:** 8\
**Last updated:** [24 October 2026 16:55 UTC](https://community.victronenergy.com/t/multi-rs-solar-ess-feeds-pv-to-grid-instead-of-charging/64330 "2026-10-24T16:55:18Z")

</div>

I have a single Multi RS Solar with a BMS NG and both MPPTs used. For the winter I switched DESS off (in VRM and in GX) and use ESS. I have set a Schedule Charging Schedule from 11h to 15h to 80% I set the AC current …

---

## [To Load or to unload](https://community.victronenergy.com/t/to-load-or-to-unload/45777)

<div class="topic-metadata">

**Author:** [@Eureka](https://community.victronenergy.com/u/Eureka)\
**Replies:** 0\
**Last updated:** [21 September 2025 20:14 UTC](https://community.victronenergy.com/t/to-load-or-to-unload/45777 "2025-09-21T20:14:54Z")

</div>

We weten inmiddels allemaal hoe we onze batterij kunnen laden via ESS/Geplande laad niveaus. Is er ook een manier om het ontladen te plannen, en met hoeveel kwh per uur? Is er bijv. een aanpassing van de remote conso…