Two circuits – two MP2s – one battery – off-grid system

Hello everyone

I have an off-grid system consisting of Pylontech batteries, a SmartSolar MPPT and an MP2 48/5000. It’s all controlled via a Cerbo GX.

Now I’d like to expand the system. I need two independent circuits (house and workshop). Naturally, the two have very different loads, and the workshop should be able to be switched off when it’s not in use.

Can I achieve this with a second MP2 with a different part number (I have one available)? And if so… how?

Thanks in advance,
Rudi

Use the MK3 to usb adapter and connect it to the cerbo and circuits you intend to run. Check in the cebo manual.

Summary

Option 1: Use an MK3-USB interface

This method allows multiple systems to be visible, but with limited functionality:

Only the system connected to the built-in VE.Bus ports contributes data to the Overview pages.

All connected systems appear in the Device List and are included in VRM energy statistics.

DVCC and ESS control applies only to the system connected directly to the built-in VE.Bus ports.

Additional Systems connected via MK3-USB do not support DVCC control and will follow their own internal configuration for charging/discharging.

There is an option (Settings → System Setup → Charge Control) to enable BMS control of a secondary inverter/charger connected to a GX device via an MK3-USB interface. When enabled, the secondary device will follow the CVL and DCL values provided by the CAN-connected BMS.

Generator start/stop logic applies only to the directly connected system.

For ESS systems, only the system on the built-in VE.Bus ports participates in ESS mechanisms. Others are visible in the Device List only.

So, if I’ve understood correctly, I can’t properly integrate the 2nd MP2 into DVCC and ESS. Is that right?

Correct.

With base settings though you will be fine.

You can invert it very easily and you are planning on switching it off and on so really don’t need it to be part of the main system.
If you want it to be more clever there is also node red.

I have something similar in place.

Thanks for the tips. I’ll give the MK3 a try and see if I like it.

I’ll have to look into Node-RED first. I only have a vague idea of what it actually is.

The system will work as it is without the node red.
So that’s not a big deal.

Sooner or later, I’ll have to get to grips with home automation anyway. So why not take a look now and see whether Node-RED is the way to go, or what else is out there? Especially with winter just around the corner. Do you happen to know a good website that could help me with that? I’ll connect the MP2 as you said for now, though.