How can I set up a three-phase MultiPlus ESS with manual changeover between grid and backup power?

Hello,

The existing setup consists of a VM-3P75CT energy meter, a 3-phase MultiPlus II 48/5000, an Ekrano GX, a battery and PV in ESS mode, so it covers self-consumption, charges the battery and feeds surplus power into the grid.

In version #2, during normal operation changeover switch “B” is set to “Multi” and changeover switch “C” to “Grid”. In the event of a prolonged power cut, changeover switch “C” can be set to “Emergency”, and if the MultiPlus fails, changeover switch “B” can be set to “Grid”. This basically works, but has the disadvantage that brief excursions beyond the grid parameter limits cause ACout2 to be switched off, resulting in a power cut for a few minutes.

Having all loads permanently connected to ACout1 is not desirable, as, for example, the sauna should not drain the battery during a power cut.

Is version #1 possible, or does ESS only work via ACout? What would be a better solution?

Variant 1 is the preferred option. In normal operation, the switch is set to “Emergency” so that the consumers continue to be supplied without interruption.
The switch is set to “Mains” if there is a problem with the Victron system or for maintenance, etc.

The sauna is then wired directly to the mains side.