Ah, yes, CCGX with VenusOS 3.55, that might be the cause for that setpoint to be missing. It would be between Grid Meter and Multiphase regulation. Im not quite sure then.
Is your gridcode allowing for DC feedin from battery?
Does the behaviour change if you set Multiphase to Sum of all phases?
As a sidenote, are you sure that your AC PV inverter is capable of running in island operation connected to the ACout? Does it support the necessary frequency-power-curve?