Hey,
i have an installation with a 3 phase multiplus and pylontech batteries.
I want to combine this with a solaredge SH5000 + storeEdge + lg-chem + import/export meter
The current system:
grid => import/export meter solaredge => multiplus ac out + solaredge ac out => load (the house)
The basics is working, the only thing i see is that the solaredge batteries keep there charge, so the system is first draining the pylontech batteries and then the battery attached to the solaredge system. I want this the other way around, can we first drain the LG chem and then the pylontech?
The second problem, i have been trying to monitor the solaredge invertor in the gx device. According to this documentation i need to enable the sunspec on the rs485 bus. But in my setup the RS485-1 connection is used as multiple modbus connection, with 2 devices, the lg-chem and the import/export meter.
So its impossible to set this to sunspec.