I have a technical issue and I am hoping someone can help me troubleshoot it.
System setup
Hardware
MultiPlus-II
Pylontech US5000 (4x)
MPPT 250/100 with 12 solar panels
Additional components: temperature sensor, generator
The system is fully off-grid. All devices are running the latest firmware versions.
Context
About a month ago I started working with Node-RED on the Cerbo GX. At that point everything worked correctly. All devices were visible in Node-RED and could be read without issues.
I then added a Shelly device to automate boiler control this week. The goal is to reduce peak loads, for example:
-
Turn boiler off during high loads
-
Turn boiler off when generator is running
-
Turn boiler off at night
-
Use excess solar intelligently etc.
Current problem
Since that change, I can no longer see the MultiPlus-II inverter inside Node-RED.
In addition:
-
Only the Shelly, batteries, generator, and MPPT are visible
-
The MultiPlus-II is missing from both Node-RED device selection and VRM Device Instances
-
The Node-RED device block for the inverter stays greyed out and cannot be selected
What I already tried
-
Full system reboot
-
Removing and reconnecting all cables
-
Rescanning devices
-
Updating all firmware
-
Restarting Node-RED
-
Verifying VRM device list
Result
Despite all of the above, the MultiPlus-II still does not appear anywhere in:
-
Node-RED device list
-
VRM Device Instances
Node-RED itself is running normally on the Cerbo GX Large image, and everything else functions as expected. The only exception is the missing inverter visibility.
Question
Has anyone seen this before, where a MultiPlus-II disappears from both VRM and Node-RED while all other devices remain visible?
Any direction would be appreciated. The system is working in general.