# Motorhome installation sanity check

**URL:** <https://community.victronenergy.com/t/motorhome-installation-sanity-check/64643>\
**Category:** DIY\
**Tags:** wiring, mppt, rv, campervan, beginner, multiplus, cerbo-gx\
**Created:** [2 November 2026 04:36 UTC](https://community.victronenergy.com/t/motorhome-installation-sanity-check/64643 "2026-11-02T04:36:55Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![oh2th](https://dub1.discourse-cdn.com/victron/user_avatar/community.victronenergy.com/oh2th/32/60406_2.png) [@oh2th](https://community.victronenergy.com/u/oh2th)\
**Post date:** [2 November 2026 04:36 UTC](https://community.victronenergy.com/t/motorhome-installation-sanity-check/64643/1 "2026-11-02T04:36:55Z")

</div>

Hi!

I’m renewing our solar installation on our motorhome and expanding the system with MultiPlus 12/1600/70. Installation is to European (Finnish) standards.

I’ve been using [Victron: 1.6kVA 12V MultiPlus 230V system schematics (BJE-260A)](https://www.victronenergy.com/upload/documents/1.6kVA-12V-MultiPlus-230V-2x150Ah-NG-Li-VEBus-BMS-NG-BMV-Cerbo-GX-Touch-50-SBP-220-MPPT-100-30-Orion-Tr-smart-BMV-712.pdf) as reference and here is the planned wiring. I’m just wondering if am I missing something in it.

For connecting with the Schaudt EBL, I referenced: [Retrofitting a DC-DC charger to a Schaudt/Lippert Elektroblock (EBL) system (EBL-99, EBL-119, EBL-221)](https://support.roamer.com/en/articles/1996290)

 ![Screenshot 2026-11-02 at 6.16.39](https://europe1.discourse-cdn.com/victron/original/3X/7/a/7a349c025568a13a408ceebadc9ba29a076c691a.jpeg)

// Tapio
