I just changed over to a lithium battery from SLA and for some reason I cannot fathom, the virtual switch Ignore AC Input no longer seems to work. Is my brain fried or did the feature get broken?
Multi 2x120
Cerbo GX II
Smart Shunt 500
This used to work on the SLA’s like clockwork, thinking the change to lithium was coincidence.
SOC is well above 20%, voltage is well above 12, and yet it goes to grid. I even tried disabling the bottom half of the last picture’s settings with -1 and still, it goes to grid.
This just keeps getting weirder. After a delay, it went to bulk charging. This never happened with the SLA’s before. It hit the SOC, immediately turned on the grid, and started charging. I’m starting to wonder if the functionality has been changed in some fashion where, it looks to see if your using a Lithium charging profile and then institutes a delay before charging.
There were about 4 or 5 updates to the Multiplus that were installed very recently. There was also an update for the Cerbo. To be honest, because the Ignore AC input had been set up long before they were installed I never checked the functionality afterwards.
And then came the lithium battery. That caused me to revisit it and notice that something had changed. The good news is that it seems to be working now. If there’s a pass-thru delay, it’s not the end of the world - it’s just different. It’s also possible the BMS did something that I was not familiar with.
I’ll update the thread if something else crops up but thank you all for looking into it!