(from the modbus specification)
When modifying to use two relays I guess the top line is the available power to start 3P charging (36A230V > 4140W), but the second row, “Power for single phase”, shows 4300W(?) Should that not be 6A*230V=1380W?
I would love to see some more information about how to run the EVCS with 1P3P operation (2x2P relays)
Cheers