# Dynamic power limiting, off grid

**URL:** <https://community.victronenergy.com/t/dynamic-power-limiting-off-grid/59423>\
**Category:** DIY\
**Tags:** pv-inverter, pylontech, cerbo\_gx, ess, offgrid\
**Created:** [18 June 2026 16:30 UTC](https://community.victronenergy.com/t/dynamic-power-limiting-off-grid/59423 "2026-06-18T16:30:26Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![M4jkl](https://avatars.discourse-cdn.com/v4/letter/m/35a633/32.png) [@M4jkl](https://community.victronenergy.com/u/M4jkl)\
**Post date:** [18 June 2026 16:30 UTC](https://community.victronenergy.com/t/dynamic-power-limiting-off-grid/59423/1 "2026-06-18T16:30:26Z")

</div>

Hi, I have a PV inverter on AC OUT with ESS and with “Optimized without battery life”, now im in off-grid. I am waiting for it to connect to the grid but the dynamic power limitation still shows 30 kW and nothing changing. Is this because the frequency control has a higher priority in off-grid than modbus?

So it only works when grid is connected?

CerboGx FW: v3.73, dynamic power limitation is enable and and communication is SunSpec with PV inverter
