Hello everyone,
I’d like to share the energy project at Catfarm, a community located in Poussan (34).
We currently have an off-grid photovoltaic system consisting of:
- PV = 7 KWp
- Victron MultiPlus-II 48/5000/70-50 – 5 kVA
- Solar production: ~21.7 kWh/day
- Consumption: ~6.2 kWh/day on average, ~9.5 kWh/day at peak
- LiFePO₄ battery: ~15 kWh, 51.2 V
- SmartSolar MPPT 250/60
- Cerbo GX + BMV + Lynx Distributor
- Older 24 V system with EasySolar 3 kVA, Skylla-TG and lead-acid battery
- 230 V single-phase diesel generator – 8 kWp indicated on our diagram
The system has been built and modified gradually over the years by various volunteers, mostly using donated or salvaged equipment. Over time, it has become quite complex, and we now need professional expertise in electrical work and Victron systems to rework the wiring, organise the installation and get everything properly back in order.
We’re therefore looking for someone in the Poussan / Montpellier / Hérault area, or more broadly in the south of France, who would be interested in coming to look at the installation and possibly helping the community with a complete overhaul of the wiring and installation.
If you’re a Victron installer, electrician, solar professional, or simply know someone who might be interested in this project, we’d be very grateful for a recommendation.
I’ve put together a short document with details of the equipment and the current system layout.
Many thanks for your help! ![]()
Yassine
Catfarm_OffGrid_Technical_Overview.pdf (225.6 KB)
Catfarm_OffGrid.pdf (459.5 KB)