I have installation where there is no Inverter…
Equipment list is following:
- 1x Cerbo-S GX
- 1x PylonTech battery connected to Cerbo via BMS.Can
- 1x SmartSolar Charger MPPT 75/10 connected to Cerbo via VE.Direct
- 1x Phoenix Smart IP43 Charger 12|30 (1+1) connected to Cerbo via VE.Direct
- 1x Energy Meter ET112 connected to Cerbo via Victron Serial to USB cable
- 1x SmartShunt 500A measuring DC Loads connected to Cerbo via VE.Direct
- 1x Orion-Tr 12/24-5A not connected to Cerbo as it has no comm interface
Battery is being charged from solar via SmartSolar + unstable grid via Phoenix Smart
AC Input is measured be CG EM ET112 configured as Grid Meter
DC Output is for 27V telco equipment measured by SmartShunt and provided by Orion-Tr
There are few non-essential AC loads behind the Grid Meter (rack light, fan)
In VRM…
AC power is correctly shown on the left side, but also incorrectly on the right side (there is no inverter but there is about 40W of non-essential AC loads - rack light, fan, etc.)
In GUI-v2…
AC power is incorrectly only shown as AC loads
Left side is empty
Phoenix Smart IP43 Charger is connected to Cerbo via VE.Direct