Do I need GFPD in my system?

For my passenger van I have a simple setup: 98W panel, disconnect, MPPT 75/15, 100Ah LiFePO4 with BMV-700 to run a cooler. Will I need a GFPD? What needs to be grounded in this situation?

Grounding
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
kai avatar image
kai answered ·

Depends on where you are and what legal requirements are in place - consult an electrician familiar with the relevant electrical regulations.

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

dzl avatar image dzl commented ·

If you'll allow me to rephrase his question,

Are there benefits to a GFPD for his application?